Nitsch Engineering conducted right-of-way retracement of NSTAR’s 118/119 Line for an eight-mile stretch, starting in Barnstable and ending in Dennis. We performed research at the various Town Halls, Registry of Deeds, and MassDOT. Nitsch Engineering established GPS control throughout, along with traditional traversing between the established GPS points. We also set photo control targets for the eight-mile stretch and other right-of-ways in the immediate area, and prepared work sheets identifying recovered right-of-way monumentation. Nitsch Engineering will set monumentation at each angle point and stake the right-of-way limits (every 200 feet on both sides) during 2011.