The City of Lowell requested a feasibility study of a site for a new high school. The 45-acre site was being used as an athletic facility which included a football stadium, parking lots, baseball field, and practice fields. Nitsch Engineering provided land surveying services for a boundary, topographic, utilities, and wetlands survey of the site.

The final site for the new building had not yet been determined so gathering this existing data was of high importance to the client. Additionally, they were hoping to get the data quickly and for less cost than traditional surveying methods. By conducting a UAV (drone) flight to capture the existing conditions, we were able to meet the City’s time and cost requirements.