Nitsch Engineering provided civil engineering services as part of the team responsible for renovating an existing 130,000-square-foot Genzyme Corporation warehouse and designing site improvements on the 20-acre site. We designed grading improvements to the existing parking lot, and designed new water, sewer, and electrical utility connections to a proposed central utility plant to be located at the back of the site. Nitsch Engineering also designed several stormwater management/drainage improvements to the site in accordance with Northborough Department of Public Works Standards.